This number is cited to a source document, and its arithmetic re-adds to the dollar (it cross-foots, or it is counted inside a total that does).
Pipes, drains and outfalls. Last year this fund spent about $2 million of savings on projects; this year’s $77,078 comes from the General Fund. The bigger list of road and drainage projects depends on the November 3 bond vote and is not in this budget (PDF p. 81).